Back to Research papers
Research paper index

Probabilistic Low-Voltage Peak Load Forecasting with Time Series Foundation Models Evaluated on Application-Oriented Metrics

Benedikt Kaas, Manuel Treutlein, Hannes Benedikt Gerber, Oliver Neumann, Cheewan Phatthanakhuha, Oliver Resch, Ralf Mikut, Veit Hagenmeyer

arXiv:2607.01966Published July 2, 20260 citations
  • cs.LG
  • foundation model

Abstract

Low-voltage load forecasting is an important component in current and future energy systems with a high degree of electrification and decentralized generation. However, current forecasting methods require significant manual effort, often lack uncertainty estimation and proper peak prediction, and they are often not adequately evaluated in terms of grid requirements. In the present study, we provide an extensive evaluation of short-term net load forecasts of 200 real-world low-voltage feeders with a focus on the rapidly evolving time series foundation models. Our study compares Chronos-Bolt, Chronos-2 and TabPFN-TS to six baseline models and demonstrates superior performance, in particular for Chronos-2. An ablation study, in which weather covariates are omitted, shows that time series foundation models adapt to increased uncertainty, despite the importance of weather information. A novel application-oriented metric links the model's forecasting capabilities in peak prediction to the trade-off in grid asset planning and operation between cost reduction and minimizing the risk of failure.

Read the original paper

This page indexes public paper metadata. The manuscript remains with its original publisher and authors.